Project Information

  • Client: Stellar Industries
  • Location: Garner, Iowa
  • Dates: 2016
  • Size: 40,000 SF
  • Delivery: Design-Build


Project Description

Dean Snyder Construction, along with ATURA architecture, was awarded the contract to design-build a new 40,000 SF pre-engineered metal building for Stellar Industries in Garner, IA. The new building replaced two existing buildings on-site and provides additional manufacturing capacity and support for Stellar.

In order for Stellar to continue operations as normal throughout construction, DSC worked around their schedule. The building site included 1/3 of a previous storage building kept from demolition in order for Stellar to continue working, and DSC crews built around it. Once the addition was complete, DSC demolished the last third of the building.

Stellar Industries was established in 1990 as the first US corporation to design and manufacture a domestic hydraulic hooklift hoist.